Facilities News Facilities Preparedness Assessment - October 2020

Facilities News Facilities Preparedness Assessment - October 2020
Posted on 11/05/2020

On October 21, 2020, representatives from Wunderlick-Malec Engineering came to the Jaffrey-Rindge Cooperative School District to perform an assessment on our current HVAC and BAS systems. Facilities personnel spent the day with the WME representatives walking through each school to view classrooms, offices, gyms, cafeterias, rooftop air handlers, attic air handlers, etc. During this time, WME took random measurements of air sampling to measure CO2 concentrations as an indicator of ventilation.

As their report outlines, all SAU facilities exceed current codes (2015 IMC, CH. 4 and ASHRAE 62.1-2013) for maintaining a safe and healthy environment for occupants.

The report can be viewed here.

Website by SchoolMessenger Presence. © 2024 SchoolMessenger Corporation. All rights reserved.